| 2008 |
|
| Maccaferri Wins Geo-Grid Reinforcement Contract For US I-35 Bridge Reconstruction |
21/02/08 |
| Maccaferri RoadMesh, pavement reinforcement mesh used on floating road trials in the Scottish Highlands |
01/02/08 |
| Boscastle flood defence project uses Maccaferri erosion protection systems |
14/01/08 |
| 2007 |
|
| New MD for Geotechnical Specialists, Maccaferri |
10/12/07 |
| New rockfall containment system keeps rail line operational during engineering works |
13/11/07 |
| Contractors choose Maccaferri soil containment system for prestige housing site |
17/09/07 |
| 18 metre high composite retaining wall cuts building costs in Monaghan, N Ireland |
06/09/07 |
| Landmark wall eases construction problems for Dudley MDC |
28/08/07 |
| Redundant quarry transformed by innovative geotechnical products |
07/2007 |
| Anchor landmark retaining walls keep traffic moving during Northern Ireland's M1 motorway reconstruction |
25/07/07 |
| Maccaferri's green terramesh, reinforced earth system, saves wildlife habitat in road widening scheme |
16/07/07 |
| Anchor retaining wall saves trees at university campus |
21/05/07 |
| New Dublin base for geotechnical specialists, Maccaferri |
11/04/07 |
| Contractors "well impressed" by Anchor Retaining Wall System |
20/02/07 |
| Retaining wall technology generates big savings in Ireland's Shannon Free Zone |
04/01/07 |
| 2006 |
|
| Retaining wall technology generates big savings at Westpark |
19/12/06 |
| Innovative retaining wall solution for Olympics footbridge ramps |
04/12/06 |
| Landmark project for innovative retaining wall system |
11/10/06 |
| High energy absorption (HEA) rockfall protection panels for steep slopes where unstable boulders represent a hazard |
21/09/06
|
| Slope engineering and the potential for segmental retaining walls in UK construction |
01/09/06 |
| Anchor retaining walls keep traffic moving in Portadown, Northern Ireland |
23/08/06 |
| Anchor retaining walls build firm support in Ireland's dynamic house-building market |
18/08/06 |
| Maccaferri secures contract for gabion walls on prestigious new Scottish air traffic control centre |
21/06/06 |
| Segmental retaining walls reduce cost and speed of the building of Belfast student accommodation |
12/06/06 |
| Maccaferri group acquires Yorkshire based Linear Composites Ltd |
14/06/06 |
| Maccaferri group acquires Yorkshire based Epitropic Fibres Ltd |
14/06/06 |
| Segmental retaining walls come of age |
22/05/06 |
| Maccaferri's steelgrid used to stabilise railway cutting in the Scottish Highlands |
17/05/06 |
| Timber crib range added to Maccaferri's comprehensive range of retaining structures |
18/04/06 |
| Maccaferri's steelgrid combines wire mesh and steel cables |
15/03/06 |
| 2005 |
|
| Reinforcing the reinforcement - High tensile steel wire mesh strengthens original concrete solution |
22/12/05 |
| Maccaferri's green engineering helps protect Scottish village from flooding |
05/09/06 |
| Maccaferri provides retaining wall solution to create level parking for new Tesco store |
09/08/05 |
| Engineered retaining wall system from Maccaferri chosen for exclusive new development in the Staffordshire countryside |
22/06/05 |
| Segmental retaining walls come of age |
08/06/05 |
| Maccaferri expands its Marketing team |
03/05/05 |
| Maccaferri's Green Terramesh chosen for flood prevention scheme in Paisley |
07/04/05 |
| Engineered retaining walls selecting the right solution |
24/01/05 |
| 2004 |
|
| Tallest Anchor Landmark retaining wall outside the US under construction in Co. Galway, Ireland |
13/12/04 |
| Maccaferri provides cost efficient retaining wall solution for redrow homes new hilltop housing development |
26/11/04 |
| Maccaferri and Acheson & Glover secure BBA (Roads & Bridges) certification for Anchor Landmark retaining wall |
13/10/04 |
| Maccaferri products chosen for Norfolk broads flood alleviation scheme |
13/09/04 |
| Maccaferri wins major order to supply geogrid for expansion programme at Edinburgh Airport |
20/07/04 |
| Maccaferri provides solution to Scottish road improvement piling dilemma |
22/06/04 |
| Maccaferri products used to stabilise historic 'Listening Mirrors' on the Kent coast |
26/02/04 |
| 2003 |
|
| Maccaferri provides dual product solution for road reconstruction scheme in Oxford |
04/12/03 |
| Maccaferri working in partnership with Acheson & Glover secures BBA certificate for Anchor Vertica segmental block wall system |
29/09/03 |
| Maccaferri provides comprehensive retaining wall solution on prestigious new development in Balerno, Edinburgh |
05/09/03 |
| Maccaferri gabions chosen for toll plaza on new Irish M1 |
03/09/03 |
| Maccaferri's green terramesh creates reinforced soil solution for car park extension adjacent to river |
08/08/03 |
| Enkagrid Pro geogrids certified for soil reinforcement in road and bridge applications within the UK |
06/08/03 |
| Basal reinforced platform proposed by Maccaferri provides solid foundation for new tanker berthing platform |
07/04/03 |
| Maccaferri secures the latest ISO9001:2000 registration |
19/03/03 |
| Maccaferri contributes to vital coastal protection work on the Hebridean Island of Benbecula |
19/02/03 |
| 2002 |
|
| New retail park to be createdon Brownfield site in Halifax |
21/8/02 |
| Innovative solution sees geotubes used to create sustainable sea defences for Norfolk golf club |
08/07/02 |
| Maccaferri gabions create new water course adjacent to picturesque steam railway |
29/05/02 |
| Maccaferri's Anchor wall chosen for engineered retaining walls adjacent to prestigious new apartments in Newcastle |
09/05/02 |
| Bio-engineering products from Maccaferri help prevent erosion at UK's first 'oval' motor racing circuit |
01/05/02 |
| Maccaferri to co-present technical seminar with Colbond geosynthetics at Civils 2002 |
08/04/02 |
| Maccaferri bio-engineering products used to stabilise cliffs overlooking Cat & Dog Steps, Seaburn, Sunderland |
22/03/02 |
| Maccaferri supplies soft landscaping solution to enhance lakeside feature on prestigious research park |
27/02/02 |
| Engineered retaining wall system from Maccaferri provides solution for perimeter structure |
02/01/02 |
| 2001 |
|
| Geotextile material supplied by Maccaferri plays a vital role in Merseyside dock redevelopment |
28/11/01 |
| Maccaferri's Paralink strip system used to create BRP for embankments supporting Rochdale canal bridge |
01/10/01 |
| Maccaferri rockfall netting used to stabilise cliff face overlooking Whitley Bay |
12/09/01 |
| Maccaferri gabions used to retain chalk cuttings on M3 motorway |
09/07/01 |
| Maccaferri gabions retain railway embankment on Glasgow - Edinburgh mainline |
18/06/01 |
| Maccaferri provides coastal protection for world famous golfing complex |
21/05/01 |
| British Waterways working with Maccaferri to reinstate damaged canal towpaths |
02/05/01 |
| Maccaferri's terramesh large makes its UK debut specified for new music centre overlooking the Tyne |
16/03/01 |
| 2000 |
|
| Maccaferri to market bio-engineering products from WE Rawson |
23/10/00 |
| Maccaferri provides solution to soil erosion for Kent section of channel tunnel rail link |
15/08/00 |
| Improved Roadmesh opens up new opportunities for Maccaferri in highways / pavement reinforfcement |
31/07/00 |
| Slope reinforcement on steep and variable slopes - Maccaferri provides the solution |
17/07/00 |
| |
|